SNAGGING SURVEYS

Finding faults with your new-build house may sound strange considering it is ‘new’, but like anything that is built by multiple people issues do occur, so poor workmanship and error is commonplace. We inspect new-build houses and apartments for defects, raising issues in a detailed and comprehensive photographic snagging report for your developer to act upon quickly.

Ideally you should have your snagging inspection approximately 1-2 weeks before completion. Not only is this arrangement more convenient for you to account for the least disruption, it is also easier for the site to work from one comprehensive snagging list rather than you raising issues over several months once you move in.

Some developers will not allow a snagging survey prior to you moving into the property, this is not ideal but if you have bought through a developer such as Bovis, Persimmon, Barratt, Bellway, Bloor, Taylor Wimpey, Redrow and so on, we recommend that the snagging survey is carried out during the first 2 months of moving into the property. The reason for this is in relation to the HBF satisfaction survey which you will receive circa 8 weeks after completion. It is important for your builder to address the items on our snagging survey to ensure they receive a positive rating when you come to complete the HBF satisfaction survey.

West Country Surveyors Ltd are qualified and experienced building professionals, able to identify minor and major issues using specialist equipment. We raise snags into a photographic snagging report that you’ll receive within a couple of days of our site visit. Whilst a snagging survey is not classed a structural building survey, we raise issues ranging from poor cavity wall insulation, draughts, leaks, poor brickwork and roof issues. We also raise aesthetic issues ranging from damaged kitchen units to paintwork blemishes. During a typical inspection (lasting 4-5 hours) we raise on average over 100 issues and provide an overview report to summarise our findings.

Our Standard Snagging Inspection will include the following checks on your new-build property:

  • High level camera inspection of roof and guttering

  • Loft inspection

  • Basic electrical test on sockets​

  • Thermal imaging of radiators

  • Plumbing tests to inspect for leaks

  • Co (Carbon Monoxide) safety test​

  • Heating system check using a thermal camera

  • Joinery issues such as doors, staircases, skirting, and so on

  • Fire safety measures

  • Level flooring, square walls and flat ceiling inspection

  • Poor workmanship with brickwork, fenestration and so on

  • Plaster and paintwork

  • Garage and groundwork

  • Soil quality test

View an example Snagging Report here

You can get a Quote for a survey you need here or, give us a call on 01823 429823 and you can discuss the best option for your prospective home.

SNAGGING SURVEYS

Finding faults with your new-build house may sound strange considering it is ‘new’, but like anything that is built by multiple people issues do occur, so poor workmanship and error is commonplace. We inspect new-build houses and apartments for defects, raising issues in a detailed and comprehensive photographic snagging report for your developer to act upon quickly.

Ideally you should have your snagging inspection approximately 1-2 weeks before completion. Not only is this arrangement more convenient for you to account for the least disruption, it is also easier for the site to work from one comprehensive snagging list rather than you raising issues over several months once you move in.

Some developers will not allow a snagging survey prior to you moving into the property, this is not ideal but if you have bought through a developer such as Bovis, Persimmon, Barratt, Bellway, Bloor, Taylor Wimpey, Redrow and so on, we recommend that the snagging survey is carried out during the first 2 months of moving into the property. The reason for this is in relation to the HBF satisfaction survey which you will receive circa 8 weeks after completion. It is important for your builder to address the items on our snagging survey to ensure they receive a positive rating when you come to complete the HBF satisfaction survey.

West Country Surveyors Ltd are qualified and experienced building professionals, able to identify minor and major issues using specialist equipment. We raise snags into a photographic snagging report that you’ll receive within a couple of days of our site visit. Whilst a snagging survey is not classed a structural building survey, we raise issues ranging from poor cavity wall insulation, draughts, leaks, poor brickwork and roof issues. We also raise aesthetic issues ranging from damaged kitchen units to paintwork blemishes. During a typical inspection (lasting 4-5 hours) we raise on average over 100 issues and provide an overview report to summarise our findings.

Our Standard Snagging Inspection will include the following checks on your new-build property:

  • High level camera inspection of roof and guttering

  • Loft inspection

  • Basic electrical test on sockets​

  • Thermal imaging of radiators

  • Plumbing tests to inspect for leaks

  • Co (Carbon Monoxide) safety test​

  • Heating system check using a thermal camera

  • Joinery issues such as doors, staircases, skirting, and so on

  • Fire safety measures

  • Level flooring, square walls and flat ceiling inspection

  • Poor workmanship with brickwork, fenestration and so on

  • Plaster and paintwork

  • Garage and groundwork

  • Soil quality test

View an example Snagging Report here

You can get a Quote for a survey you need here or, give us a call on 01823 429823 and you can discuss the best option for your prospective home.